One of the Permian’s largest, most anticipated, natural gas takeaway projects in years has declared, “Let’s get this party started”. The Blackcomb Pipeline is officially open for business. The largest addition of infrastructure in years to the Perm’s gas takeaway network will further stomp Waha pricing bottlenecks in a basin producing ~29.2 BCFD of residual gas and volumes expected to rise.

Reese Energy Consulting today trains the spotlight on Blackcomb, a 365-mile giant “relief valve” designed to flow 2.5 BCFD of gas from the Waha hub in West Texas to the Agua Dulce in South Texas, where associated gas meets all kinds of market connections.

In a joint venture led by Enbridge, with partners WhiteWater, MPLX, and Targa, the Blackcomb project broke dirt in September 2025 with an in-service date of Q3 2026. Now here we are, a headline and a deadline met right in time for a turkey leg.

The natural gas pipeline buildout in the Permian remains alive and kicking but the goal post continues to move. As oil production nears a record 6.9 MMBPD, the associated gas that comes with every barrel will require more and more capacity. Time to show our midstreamers some love. And let’s get this party started.